Santiago Garage Conversion ADU
Project Summary
Design: $8,700
Permits & Other Fees: $9,140
Construction: $117,100
Grand Total: $134,940
About the Project
This 1965 concrete masonry unit (CMU) garage had a perfectly good foundation, roof structure, and concrete slab that was rehabilitated in partnership with InfillPDX as the designer and financed by the BackHome Loan. Permitting in Portland took 9 months due to the CMU blocks being partially unreinforced.